Team Piraña continues to march toward the finish line. Mav crossed the bridge between Bridgeport and the TATUR Turn. The bridge over the South Canadian River is 0.8 miles long, and narrow with no shoulder at all. The race provided a vehicle to escort uncrewed runners across. T3 followed Mav and Weeble on their trek.
A Bridge To Far
by admin on November 9, 2008